Gate: Code Merge (Compound Engineering)

What It Replaces

14-agent parallel code review → GM reviews findings → GM decides to merge. Currently <1 day turnaround. This gate formalizes the already-highly-encoded review process into explicit pass/fail criteria.

Pass Criteria (visible to executing agent)

Tier 1: Automated Review (blocking)

  1. All tests pass: Unit tests, integration tests, linting, type checking — no regressions.
  2. P1 findings resolved: All Priority 1 findings from review agents (security vulnerabilities, data integrity issues, broken core flows) must be addressed before merge.
  3. Plan adherence: Implementation follows the approved plan.md or deviations are documented with rationale.
  4. No broken core flows: End-to-end user journey for the product’s primary use case works after the change.

Tier 2: Compound Quality (blocking)

  1. Compound artifact produced: At least one of: docs/solutions/ entry, CLAUDE.md update, reusable pattern extracted, or reviewer checklist update. The system must learn from every PR.
  2. Review agent findings triaged: All P2/P3 findings have been reviewed by GM and either addressed or explicitly deferred with documented rationale.

Tier 3: Advisory (non-blocking, flags for GM review)

  1. Performance impact: No measured performance regression beyond acceptable thresholds.
  2. Architecture alignment: New patterns follow existing codebase conventions (or intentional deviation is documented).
  3. External dependency changes: Any new dependencies flagged for GM awareness.

Satisfaction Metric

Target: 95% of PRs passing this gate should ship to production without requiring rollback within 48 hours. If rollback rate exceeds 5%, gate criteria or review agent configuration needs adjustment.

On Fail

  • Tier 1 failure: PR cannot merge. Agent receives specific feedback on failing criteria. Agent attempts fix and resubmits.
  • Tier 2 failure: PR cannot merge. GM is notified with the specific gap (missing compound artifact or unreviewed findings). GM can override if the situation warrants (e.g., hotfix where compound step can be deferred).
  • Tier 3 flags: Informational only. GM reviews flags at their discretion.
  • Repeated failures (3+ cycles): Escalate to Engineering Lead (Andrey Galko) to assess whether the plan was insufficient.

Escalation Package

When escalated, GM sees:

  • The full diff
  • All review agent findings categorized by priority
  • Which specific gate criteria failed
  • Agent’s self-assessment of the failure
  • Suggested fix or explanation of why the agent couldn’t resolve it

Architecture

  • Type: Sequential (Tier 1 → Tier 2 → Tier 3), blocking at Tiers 1-2
  • Runs: Before any PR merges to main/production branch
  • Parallel with: The 14 review agents run in parallel with each other (already standard practice)
  • GM role unchanged: GMs retain full merge authority. Gate formalizes what they already check; doesn’t add new overhead.
  • Override mechanism: GM can override any Tier 2 failure with documented rationale (e.g., emergency hotfix).

Political Risk

  • Product GMs (Low): This gate formalizes their existing workflow, not constraining it. The compound artifact requirement (Tier 2, criterion 5) is new but aligned with compound engineering’s core philosophy.